Annual capcity 20000T to 200000T per year
The production line outline:
This design is an annual output of 30000 tons of construction plaster powder production line, is a high degree of automation, equipped with less staff, the craft is mature, the powder stable quality, environmental protection and efficient production line, after many years research to create a plaster powder production mode, domestic initiative.
1.1 work system:
Broken parts: 300 days times 16 hours
Grinding parts: 300 days x 24 hours
Burning parts: 300 days x 24 hours
Store conveying parts: 300 days x 24 hours
1.2 the time: 3-5 T/h (product).
1.3 raw materials: natural gypsum (massive, the diameter is not more than 300 mm, etc.).
Workers distribution
The Crusher System: 2 person/ day (including the forklift driver
The Mill System: 1 person/ eight hours (that is 3 people/ day)
The Calcine System: 1 person/ eight hours (that is 3 people/ day)
The Heat Supply System: 2 people/eight hours(that is 6 people/day)
Electrical Engineering: 1 person/ day
Machinery Maintenance: 1 person/ day